PRECAUTION FOR BALING PRESS MACHINE-
- Clean the filter from the oil tank with help of diesel every week
- Give oil to some part of machine where rotating or sliding take place within 2-3 days like-lock plate and lid plate joining part,whole in bush and shaft
- Always check that scrap never come between lock and door cylinder junction point
- Clean the ac chiller forward part within 3-4 days with the help of blower,start chiller half an hour before starting of machine
- Adjust or tight the bolt of every cylinder with power in week if needed
- Check oil tank- oil tank is full with oil all time,chiller machine is always fully immersed in oil tank
- Use good wire,stablizer for electric motor and ac connection
- Before starting machine always sure ejector plate is fully set on its surface and clean the below surface of ejector pressure plate
- Never put extra scrap above the chamber it can harm the machine
- If want to cut the scrap always sure not to cut from only one side edge of machine,put it on both edges side chamber of machine
- Clean ejector whole time to time,so any leakage can be find easily
- Clean the machine with dry clothes
- Machine always placed on plane surface not inclined surfaces
- Never switch off the machine in half cycle always switch off the machine in starting moving point.